The Biodata Innovation Centre project to provide new flexible office space for start-up and growing companies involved in research activities relevant to the campus.
The building is linked to the new sequencing laboratories within the adjoining Sanger Sequencing Building. The new 2-level buildings also provide flexible break-out and meeting spaces for collaboration and knowledge-sharing between businesses operating within the facility, as well as a café and amenities within the bridge link.
Wellcome Trust Genome Campus
Cost Monitoring (Development Monitoring)
Pharmaceutical
£13.5m (2017)
Architect: FDG
Engineer: Arup
Main Contractor: Kier Construction Ltd
Project Manager: 3PM
The new building provides flexible break-out and meeting spaces for collaboration and knowledge-sharing
OUR PROJECTS
To provide an increased capacity for the future of High Performance Computing
A new leisure facility for Sparkhill replacing the original Sparkhill Baths which closed in 2008