To provide an increased capacity for the future of High Performance Computing within the fallow room of the existing Data Centre.
This contract is for the detailed design, construction, fitting out and commissioning of all works (internal and external and including mechanical and electrical service installations and new plant rooms) and Lifecycle/infrastructure development/alterations as required in order to achieve this aim.
Images © ISG Fit Out
Wellcome Trust Genome Campus
Cost Management
Pharmaceutical
£9.5m (2017)
Architect: FDG
Engineer: Evolve
Main Contractor: ISG Fit-out Ltd
Service Engineer: Arup
Structural Engineer: Evolve
Project Manager: 3PM
Detailed design, construction, fitting out and commissioning of all works and Lifecycle/infrastructure development and alterations